DPC completed the design, supply and installation of the HVAC & fit out package to a new build doctors surgery in Hertfordshire.
The works comprised of two AHU’s to the roof supplying to dirty utilities, clean utilities and common areas. A feature here was the F7 filtration installation to the minor operations suite. With strict audible levels to adhere to, the design and commissioning of the ventilation system was key to achieve the ambitious targets, whilst achieving the correct air flow rates.
Daikin air conditioning units were installed to every office, communal waiting area and treatment rooms, all controlled by a centralised controller.
The works included the supply and commission of a Trend BMS controlled system, a commercial heating and hot water plant room which consisted of 2no boilers, 1no hot water cylinder, CT pumps, VT pumps, heat meters and major leak detection system on the mains water supply.